Skip to content

General inspection of separator systems

Cost savings thanks to state-of-the-art testing and measuring equipment.

A general inspection with functional and leak test of the entire separator system is required regularly – at the latest every five years. We check all points required by DIN 1999-100 and DIN EN 858-2.

Our specialists always have testing and measuring equipment with LGA approval and the latest state of the art. This enables us to minimise testing times and costs.